**Here's where I left off last time with the guest cabin build... We had JUST finished with the tiny guest cabin build and from this point, we were DEFINITELY waiting a few years before starting work on the main cabin! Until the following weekend came along and we decided it wouldn't hurt to maybe just start forming for the floor... We're not so good at sticking to schedules when it includes having to wait.......**
So now, on to the Main Cabin start!
I figure since we are getting on toward the finishing of our main cabin build I would try and share what we have done so far...
I was able to help with building the guest cabin but I have only been able to help little bits with the main cabin so far... now that I have some good mobility back, that is about to change! I have big plans for being able to help with the finishing of the cabin this year and now that the weather is turning and there are tiny hints of springtime in the air, I am getting pretty excited about finally finishing and getting to the whole enjoying part of having a camp!
We were already into Fall and weren't supposed to start on the main cabin for a few years buuuuut the boys weren't overly comfortable with staying in the tiny guest cabin for long periods and we wanted to be closer to the water in comfort as well as thinking that it would just be a relief to get all the building mess over and done with so we could just get down to camp relaxing and fun.
So, I started designing and Enz started forming and together we tweaked the plans until we had our agreed upon floorplan... small but with a larger open feel to the cabin that we hoped would live up to our expectations.
Forming the cabin foundation was the first step.
| Forming is finicky and not fun but... it's a necessary evil and the first footprint view is always exciting in the start of making it all happen! |
| A long way to go but it's a good start. |
| The boys were excited to watch their dad tying final bits of rebar... but only from the heated warmth of the guest cabin! |
Next came the concrete finishing work!
| The boys were pretty bummed that we had missed the concrete trucks because the drivers had been earlier than planned... |
| ...but at least we got there in time to watch the magic happen! Nonno was already smoothing carefully around the plumbing pipes. |
| The two master finishers were kind enough to indulge my request for a quick commemorative picture! |
| First up in finishing was the rough blade finish along with the finicky anchor bolt placing and plumbing pipe edging. |
| After the rough blades, it was time to switch to the smoothing blades. |
PlayDay supervisor nap/chat-breaks were as necessary as they were cozy and quiet in the guest cabin!
| Play, as usual, was annoyed with his big brothers carry demands... "Seri'sly?" he asked me, "does he act'lly neeeeed a carry every single time???!" |
| Then the boys watched for a minute longer just to be sure everyone was still in top form before they decided they were good for their break. |
| They chatted (complained) for a few minutes about their workload... |
| ...before demanding to be tucked in for a good, long afternoon nap! |
But the supervisors didn't give many breaks to the Finishers continuing to work on the cabin floor...
| Machine work... |
| ...and hand-work makes for a hard day of non-stop WORK! |
This is a little video of the concrete finishing action... It really is an art form and these two Concrete Finishers have been mastering the trade for over 50 years!
And how fortunate and grateful we are that they are still both physically able and heartfully willing to help us on what will hopefully be our last building project ever... But who knows, I always say it's our "last time ever!!"
To be continued...